Supplier Multiple (5000)Fixed Period (4 periods)Lot for LotProduct Structure Tree (BOM)ProblemProjected AvailableGross RequirementOn OrderPlanned Order CompletePlanned Order StartsPast DueMV2008Qty Per AssyQty On HandLead TimeItem & DescriptionWhere UsedPeriodFACTS OF THE CASEPRACTICE ACTIVITIESQuantityM1002A Moped manufacturing company competes in the US market. The materials toThe company expects to sell the following amounts:MopedFrameDrive Train AssemblyEngineSpark PlugBoltTireMV2002MV2004XG117XG125XG238materials to build the Drive Train include 1 Engine 4 Spark plugs and 10 Boltsbuild a Moped include: 1 Frame 1 Drive Train Assembly and 2 Tires. TheDraw the Product Structure TreeCalculate the material required (how many and when) for all ItemsLead Times for each item are the following:ItemDescription 2MRP Practice Exercise 2 BU 141 Spring 2012 of 1.002.003.004.005.006.007.008.009.0010.0011.0012.009800.0012000.007500.0014000.008000.008000.0042000.00300000.0072000.0010000.00 2MRP Practice Exercise 2 BU 141 Spring 2012 of 1.002.003.004.005.006.007.008.009.0010.0011.0012.009800.0012000.007500.0014000.008000.008000.0042000.00300000.0072000.0010000.00 2MRP Practice Exercise 2 BU 141 Spring 2012 of 1.002.003.004.005.006.007.008.009.0010.0011.0012.009800.0012000.007500.0014000.008000.008000.0042000.00300000.0072000.0010000.00 1.002.001.003.002.003.003.001.000.002.008133.843.009000.004.0010000.005.008217.006.0011700.007.0014000.008.0022000.00
Attachments: