Supplier Multiple (5000)Fixed Period (4 periods)Lot for

    Supplier Multiple (5000)Fixed Period (4 periods)Lot for LotProduct Structure Tree (BOM)ProblemProjected AvailableGross RequirementOn OrderPlanned Order CompletePlanned Order StartsPast DueMV2008Qty Per AssyQty On HandLead TimeItem & DescriptionWhere UsedPeriodFACTS OF THE CASEPRACTICE ACTIVITIESQuantityM1002A Moped manufacturing company competes in the US market. The materials toThe company expects to sell the following amounts:MopedFrameDrive Train AssemblyEngineSpark PlugBoltTireMV2002MV2004XG117XG125XG238materials to build the Drive Train include 1 Engine 4 Spark plugs and 10 Boltsbuild a Moped include: 1 Frame 1 Drive Train Assembly and 2 Tires. TheDraw the Product Structure TreeCalculate the material required (how many and when) for all ItemsLead Times for each item are the following:ItemDescription 2MRP Practice Exercise 2 BU 141 Spring 2012 of 1.002.003.004.005.006.007.008.009.0010.0011.0012.009800.0012000.007500.0014000.008000.008000.0042000.00300000.0072000.0010000.00 2MRP Practice Exercise 2 BU 141 Spring 2012 of 1.002.003.004.005.006.007.008.009.0010.0011.0012.009800.0012000.007500.0014000.008000.008000.0042000.00300000.0072000.0010000.00 2MRP Practice Exercise 2 BU 141 Spring 2012 of 1.002.003.004.005.006.007.008.009.0010.0011.0012.009800.0012000.007500.0014000.008000.008000.0042000.00300000.0072000.0010000.00 1.002.001.003.002.003.003.001.000.002.008133.843.009000.004.0010000.005.008217.006.0011700.007.0014000.008.0022000.00
    Attachments:

                                                                                                                                      Order Now