Statistic Project

    You are required to rework this project. Using international trip from Portland, Oregon to Lagos Nigeria from the last 4 years. In each powerpoint slide, provide talking points/notes as well.

    Use of Minitab will help the analysis.

    Course Project

    Select an activity or process you engage in on a regular basis. Examples include the following:

    o . International Travel. From US To Nigeria in the last 4 years. From 2012 to date. You will measure Outbound, Return flights time and as well as the cost. I

    Select a metric/performance measure, for the activity/process you selected.

    For example, if you select going to and from work, a possible metric would be the time it takes to travel in each direction.

    Collect data for the activity/process over the course of the term.

    Graph the data and calculate summary measures, using a variety of graphical tools.

    • Make a short presentation (10-15 minutes) during the last class session.
    Your presentation should include the following:

    1. A title page.
    2. A description of the activity/process selected.
    3. The metric used to measure performance.
    4. The actual data collected.
    5. The graph(s) and summary measures used to analyze the data.
    6. Your analysis/conclusions based on the graph(s) and summary measures.
    7. Final observations. What difficulties, if any, were encountered? What key learning occurred for you as a result of carrying out this project?

                                                                                                                                      Order Now