SCATTER PLOT FOR THIS ONE USING SCENARIO POSED. A proje

    SCATTER PLOT FOR THIS ONE USING SCENARIO POSED.
    A project manager at Softcorp has been collecting coding error data during system test as shown in the table below. Prepare a scatter plot fit a regression line and estimate the number of errors expected in a module of 25000 lines.Software module
    Module Size
    (1000 lines of code)
    Number of errors
    1
    16
    7
    2
    15
    5
    3
    17
    6
    4
    10
    5
    5
    22
    10
    6
    8
    3
    7
    11
    5
    8
    12
    8
    9
    14
    9
    10
    7
    3
    11
    5
    2
    12
    13
    7
    13
    20
    12
    14
    18
    10
    15
    12
    8
    HISTOGRAM OF ABOVE PROBLEM OF MODULE SIZE.
    For the above problem plot a histogram of module size in this program.
    2
    Attachments:

                                                                                                                                      Order Now