Just Positive Statements

    Just Positive Statements

    COLLAPSE
    From the point of view of the captain I think the problem was ignoring BP engineers about the wrong casing. As well as Halliburton cement warnings because of the extra time to do it properly. BP was already behind 43 days at a cost of more than $21 million dollars.
    Important Facts
    Wrong casing being used
    Increased “kicks”
    Blowout preventer leaking
    Continued using leaking preventer at lower psi
    Ignoring Halliburton about cement procedures
    Six “centralizers” not recommended twenty one “centralizers” used
    Ignoring unsatisfactory test results
    Assumptions
    I assume the issues related to the leaking preventer, wrong cement casing and “centralizers” were kept of Transocean and the captain. If this information was presented to them they could shut down drilling until it is fixed making them more money and keeping the rig safe.
    Criteria for Response
    Having a Plan of action for emergencies
    Chain of Command in place ( know who is in charge)
    Alert Coast guard and shore of any explosion
    Three alternative solutions
    MMS shuts down testing completely until the preventer is repaired.
    Do not ignore Halliburton use the procedures laid out for proper cementing and install the additional “centralizers”.
    Stop drilling and install the proper casing for the well as warned by BP engineers

                                                                                                                                      Order Now