Jan and Kim Levering have decided to expand their IT consulting business.

    Jan and Kim Levering have decided to expand their IT consulting business. They have leased space in a nearby building. The following are the details:
    • They will have an entire floor that has the following:
      • a receptionist area
      • 2 offices (one for Jan and one for Kim)
      • a conference room
      • an office that will accommodate 15 cubes for their consultants
      • a computer room to house their server(s)
    • They currently have 8 Windows XP systems set up in a workgroup
    They would like you to develop a 2-phased plan. The first phase involves moving from the current office to the new office. In a 4-page report, you need to do the following:
    • Diagram the network and identify the topology and components:
      • Their existing equipment is as follows:
        • 8 XP systems
          • 1 each in Jan and Kim’s offices
          • 6 systems cubes (1 per cube)
        • 1 Windows Server 2008 (standard edition) system in the computer room
        • 1 printer in the computer room
        • …….
          …..
      • Include the following:
        • IP addressing scheme (use static addressing)
        • subnetting/supernetting
        • subnet mask for phase 1
    • Provide an installation guide on how to set up the Windows Server 2008 system and the network, including the following:
      • illustrations of the server installation process
      • a minimum of 8 Windows Server 2008 screenshots, with detailed explanations
      • descriptions of the settings for the following:
        • server roles
        • naming conventions
        • disk format (NTFS or FAT)
        • joining
        • security
        • centralized versus decentralized administration
      • a discussion of TCP/IP configuration
      • a comparison of settings between workgroup and domain
      • an explanation of typical installation problems/difficulties related to the following:
        • hardware
        • software
        • the network
    The second phase, to be completed later, will be to expand their network to accommodate additional equipment.
    Must be a 4 page word Docment in APA format,  With at least 3 references, This must be orginal and non plagarized
    …….
    …..

                                                                                                                                      Order Now