building 2 assignment

    Each group must analyse the desired construction systems (as annotated on the drawings) and provide:

    (a) (b) (c) (d) (e)

    All this

    1. 2.

    a preliminary budget cost for the project, based on current and commercially available cost data – task due Week 3
    a preliminary time schedule for the project development from DA to hand-over using hand-drawn or computer based (MS Project or similar) Gantt chart, – task due Week 4

    reproduce a ArchiCAD drawing of this building or using similar computer graphics, or a scaled hand drawing of this building – task due Week 5
    a recommendation for a project delivery method, giving clear reasoning for the desired pro-forma contract – task due Week 6,

    detailed specification for two building systems plus one fit-out trade in Reception or the Caf̩ area Рtask due Week 7, and
    information must be presented in a logical sequence in two formats:

    in a written report, – task due Week 9, before the Christmas break, and
    as a verbal and visual (PowerPoint) presentation to fellow students in your allocated tutorial timeslots – task due Weeks 10 or 11, after the Christmas break.