BIS245 Week 5 Quiz 2017 (A++++++)

    QuestionQuestion 1.1. (TCO 2) The process of checking the reliability of data is called (Points : 4)data validation.input mask.primary key.validation rule.Question 2.2. (TCO 2) When entering data into a field, which of the following would require the user to input a value that is higher than a zero? (Points : 4)0>0=>0>=0>Question 3.3. (TCO 2) Using an input mask, a symbol that will force all characters typed into a field to appear in all caps is (Points : 4)>.”.’.<>.Question 4.4. (TCO 2) To reduce problems that may occur in generating queries and reports, you could place lookup values into a (Points : 4)data type.field.list.table.Question 5.5. (TCO 2) An input mask placed on a form will apply to (Points : 4)all forms based on that table.all forms in the database.all forms based on that table and the table itself.that specific form only.Question 6.6. (TCO 5) All of the following are performed in the design view of a form EXCEPT (Points : 4)adding pictures, lines, calculations, and controls.changing the size of the form sections.entering a data value.modifying the properties of a form.Question 7.7. (TCO 5) A calculated control is (Points : 4)a bound box.a text box containing a description.an unbound box that the user will fill in with a numeric value.contains a formula that displays the result.Question 8.8. (TCO 5) If you click on the form tool, you will open a(n) (Points : 4)existing form.new form in design view.new form in layout view.wizard to design a form.Question 9.9. (TCO 5) In the design view of a form, which of the following would NOT be performed? (Points : 4)Add calculations, controls, pictures, and lines.Change the size of a form section.Enter a data value.Modify the properties of the form.Question 10.10. (TCO 5) A form is altered in what view? (Points : 4)Layout ViewDesign ViewDatasheet viewTable view

                                                                                                                                      Order Now