Assignment 3: Defining the Project ScopeReview the project case. Determine the s

    Assignment 3: Defining the Project ScopeReview the project case. Determine the scope of the District 4 Production Warehouse Move project from the information provided in the case. Using the Project Scope Checklist prepare a scope document for review and approval by the project sponsor prior to starting the project.Project Scope ChecklistSubmit your report to M1: Assignment 3 Dropbox by Wednesday November 27 2013.Prepared a project scope document that is ready for sign-off.Determined the complete scope of the project.Included all sections from the scope checklist.PROJECT OBJECTIVETo construct a high-quality custom home within five months at cost not to exceed $350000.DELIVERABLES A 2200-square-foot 2 -bath 3-bedroom finished home. A finished garage insulated and sheetrocked. Kitchen appliances to include range oven microwave and dishwasher. High-efficiency gas furnace with programmable thermostat.MILESTONES1. Permits approved March 52. Foundation poured March 143. Drywall in. Framing sheathing plumbing electrical and mechanical inspections passed May 254. Final inspection June 7TECHNICAL REQUIREMENTSPage1. Home must meet local building codes.2. All windows and doors must pass NFRC class 40 energy ratings.3. Exterior wall insulation must meet an R factor of 21.4. Ceiling insulation must meet an R factor of 38.5. Floor insulation must meet an R factor of 25.6. Garage will accommodate two large-size cars and one 20-foot Winnebago.7. Structure must pass seismic stability codes.LIMITS AND EXCLUSIONS1. The home will be built to the specifications and design of the original blue

                                                                                                                                      Order Now