Punggol Power Co. (PPC) operates two power plants: a 15,000 kWh fuel oil plant, and a
5,000 kWh natural gas plant. The kWh figures refer to the plant’s maximum generating
capacity. At current fuel prices, it costs $0.15 to generate 1 kWh from the fuel oil plant, and
$0.20 to generate 1 kWh from the natural gas plant. PPC can buy any amount of fuel and
generate any amount of power (up to the operating capacity of each power plant). PPC also
faces costs which do not vary with output: these are depreciation of $1,500 for the fuel oil
plant, $1,000 for the natural gas plant, and $2,000 for management costs. It is not possible to
sell any plants or change management. If Punggol Power Co. needs to supply electricity
above their maximum operating capacity, PPC has a contract with another power generator to
purchase as much power as needed (for resale) for $0.30 per kWh.
(a) Write down Punggol Power Co.’s fixed cost, marginal cost, and total cost function.
Briefly explain your answer for each cost component. Hint: You should think about
the order in which power plant(s) should be used, to minimise the costs of supplying a
given quantity of power; your final answer may have multiple total cost functions.
(6 Marks)
(b) Using a well-labelled graph, illustrate and examine Punggol Power Co.’s marginal
cost function for the range Q = 0 to Q = 25000.
(4 Marks)
(c) Market demand for electricity is given by P = 2 – 0.0001Q. If Punggol Power Co. set
prices as though it were a perfectly competitive firm, what would be the market price
and quantity?
(5 Marks)
ECO201e Group-based Assignment
SINGAPORE UNIVERSITY OF SOCIAL SCIENCES (SUSS) Page 6 of 6
(d) Suppose Punggol Power Co. set prices as though it were a monopoly. Market demand
remains the same at P = 2 – 0.0001Q. What would be the market price and quantity?
(5 Marks)
(e) A new energy market policy prevents Punggol Power Co. from selling to customers
directly. Instead, Punggol Power Co. must tender for a contract to supply a fixed
amount of electricity. The contract is for 22,000 kWh. In the short run, considering
the shutdown condition, compute the minimum price that Punggol Power Co. can
afford to bid in their tender. Explain your reasoning.
(5 Marks)
(f) Punggol Power Co. is considering restructuring their assets to become more
competitive in the long run when tendering to supply electricity. PPC is considering
selling the natural gas plant. The sale price is expected to equal existing debt for the
plant and will not generate profits. Should PPC sell their plant, and how does their
decision depend on forecasts of future electricity demand? Remember that PPC has a
contract to purchase as much power as needed – for resale – for $0.30 per kWh. (Hint:
PPC’s objective should be to minimise their long-run breakeven price)